Kaison Mulei Shisigejingzi 800MW Wind Power Project
The Kaison Mulei Shisigejingzi 800MW Wind Power Project is a landmark large-scale renewable energy development in Xinjiang, China. The site faces extreme cold climate conditions, with winter temperatures dropping below -20 °C, making reliable foundation grouting a critical challenge.
For this project, Sino-Sina Building Materials Co., Ltd. supplied CBGM Antifreeze Wind Power Grout.
This grout provided:
Cold climate adaptability: consistent performance at -15 °C to -20 °C.
High early compressive strength: accelerated turbine installation and secure load transfer.
Non-shrinkage with micro-expansion: void-free bedding beneath base plates and around anchor bolts.
Excellent flowability and pumpability: continuous placement even in severe cold.
Durability: resistance to frost, sulfate, and chloride attack, ensuring long-term stability.
By adopting CBGM Antifreeze Grout, the project achieved reliable turbine foundations, improved construction efficiency, and long-term durability in one of China’s most challenging wind farm environments.
Related Products
Related Cases
Start Enhancing Your Business With a Concrete Solution Today
Our products have undergone rigorous testing at our national testing laboratory (CABR testing center co., ltd). Renowned Fortune Global 500 firms such as China Railway Group Limited, China Communications Construction Company Limited, and Sinohydro are among our esteemed clients.
Navigation
Navigation
Contact Us
Get in Touch
Get in Touch