Specialty Grouting

  • SW Ultra-High-Yield Mine Void Filling Grout

  • SW Ultra-High-Yield Mine Void Filling Grout

  • SW Ultra-High-Yield Mine Void Filling Grout

SW Ultra-High-Yield Mine Void Filling Grout

SW produces a large volume of stable underground fill from a relatively small quantity of dry material, making it suitable for goafs, empty roadways and mine fire-control filling.


 Very High Filling Yield

Depending on the selected grade, approximately 100–400 kg of dry material is required per cubic metre of filling material.


 Nine Water-Ratio Grades

SW-3 to SW-11 cover water-to-powder mass ratios from 3:1 to 11:1.


 Stable Before Mixing, Rapid Setting Afterwards

The separate A and B slurries remain flowable before combination and gel within 30 minutes after mixing.


 Designed for Large Underground Voids

The material is suitable for goaf filling, abandoned roadways, cavity filling and underground fire-control grouting.


Share:

Product Introduction

SW Ultra-High-Yield Mine Void Filling Grout is a two-component inorganic filling material developed for large-volume underground filling.


It consists of separate Component A and Component B mineral powders. Each component is mixed with water independently. The two slurries remain flowable before mixing and are pumped through separate lines to the filling area.


SW grades use water-to-powder mass ratios from 3:1 to 11:1. Depending on the selected grade, water represents approximately 89.7% to 97.0% of the filling body by volume. Dry material consumption is normally about 100–400 kg per cubic metre.


After the two slurries are combined at a 1:1 ratio, the grout gels within approximately 30 minutes. The setting time can be adjusted for pumping distance and site conditions.


The hardened filling body is based mainly on a water-retaining mineral structure. When placed in a confined filling area, it develops sufficient early strength for goaf, roadway and cavity filling.


SW is intended primarily for high-volume filling and mine fire-control applications. It is not positioned as a high-strength structural rock-consolidation grout.



SW Super High Water Filling Grout

Product Parameters

GradeWater/Powder Mass RatioWater Volume Content4 h Strength1 d Strength3 d Strength7 d Strength
SW-33:189.7%1.00 MPa1.60 MPa1.80 MPa2.00 MPa
SW-44:192.1%0.50 MPa0.80 MPa1.00 MPa1.20 MPa
SW-55:193.5%0.30 MPa0.50 MPa0.65 MPa0.80 MPa
SW-66:194.6%0.20 MPa0.40 MPa0.50 MPa0.60 MPa
SW-77:195.3%0.15 MPa0.25 MPa0.35 MPa0.40 MPa
SW-88:195.9%0.10 MPa0.20 MPa0.25 MPa0.30 MPa
SW-99:196.3%0.10 MPa0.15 MPa0.20 MPa0.25 MPa
SW-1010:196.7%0.05 MPa0.10 MPa0.15 MPa0.20 MPa
SW-1111:197.0%0.05 MPa0.10 MPa0.12 MPa0.15 MPa
ParameterSpecification
Material systemTwo-component inorganic filling material
A/B mixing ratio1:1
Gel time after mixingWithin 30 minutes, adjustable
Approximate dry material consumption100–400 kg/m³
Reference standardGB/T 39337-2020
Packaging25 kg moisture-resistant bags
Shelf life6 months


Product Usage

Typical Applications


• Goaf filling in underground coal mines

• Filling of abandoned and empty roadways

• Large underground cavity and void filling

• Bagged filling in mechanised mining operations

• Underground fire-prevention filling

• Sealing of air-leakage paths in mined-out areas

• Filling associated with selected partial-extraction mining methods


Application Method


1. Inspect and isolate the filling area.

2. Install retaining structures, bulkheads or filling bags where required.

3. Prepare Component A and Component B separately using the specified water ratio.

4. Maintain agitation while the separate slurries are stored.

5. Pump A and B through separate lines using matched flow control.

6. Combine the two slurries at a 1:1 ratio in an in-line mixer.

7. Deliver the mixed grout directly into the filling area.

8. Monitor filling level, pipeline pressure and slurry flow continuously.

9. Stop filling when the designed volume or level has been reached.

10. Flush slurry lines and mixing equipment immediately after completion.


The SW grade must be selected according to required filling yield, early strength, confinement condition and mine operating requirements.


Product Documentation

SW Ultra-High-Yield Mine Void Filling Grout

SW super high water filling grout slashes mining expenses through its high-volume, quick-set inorganic composition for backfill tasks.

Mortero de Relleno de Alta Agua SW

Mortero ecológico para relleno minero.

Related Products

W-6 Polyurethane Injection Grout (Two‑Component, Closed‑Cell)

W-6 Polyurethane Injection Grout (Two‑Component, Closed‑Cell)

Two‑component PU injection grout that reacts to form a closed‑cell structure for reliable water cut‑off, void filling and slab undersealing. Adjustable gel time, high expansion and frost resistance (≥F200) enable rapid reopen on critical assets such as airport runways.

High-Yield Two-Component Mine Backfill Grout

High-Yield Two-Component Mine Backfill Grout

A high-yield, two-component inorganic backfill grout developed for goaf filling, gob-side entry support, abandoned roadway filling and underground mine voids.

Ultra-Low Viscosity Epoxy Injection Grout

Ultra-Low Viscosity Epoxy Injection Grout

This epoxy injection grout lineup handles cracks from 0.05mm to >0.2mm, boasting tensile strengths ≥20 MPa and shear ≥15 MPa. Models like HP-3 deliver ≥70 MPa compression, making them reliable for wet or dry bonds in tough repairs.

AquaBond 40 NF Non-Foaming Structural PU Injection Resin

AquaBond 40 NF Non-Foaming Structural PU Injection Resin

A dense, non-foaming structural injection resin that combines water sealing with reinforcement of concrete, rock and underground ground.

MT Expanding Borehole Sealing Grout

MT Expanding Borehole Sealing Grout

An expanding, low-permeability inorganic grout for long-term sealing of gas drainage and other underground mine boreholes.

Bridge Bearing Grouting Material

Bridge Bearing Grouting Material

High-strength non-shrink grouting material for bridge bearings with excellent flowability, durability and bonding performance.

SW Ultra-High-Yield Mine Void Filling Grout

SW Ultra-High-Yield Mine Void Filling Grout

A two-component inorganic filling grout that uses water-to-powder ratios from 3:1 to 11:1 for economical filling of large underground voids.

Start Enhancing Your Business With a Concrete Solution Today

Our products have undergone rigorous testing at our national testing laboratory (CABR testing center co., ltd). Renowned Fortune Global 500 firms such as China Railway Group Limited, China Communications Construction Company Limited, and Sinohydro are among our esteemed clients.


Contact Us

Contact Us

Tel.:

+86 153 7387 2353 Manager Guo

E-mail:

WhatsApp:

Get in Touch

Get in Touch

CAPTCHA
Copyright © Sino-sina Building Materials Co., Ltd. All Rights Reserved | Sitemap | Powered by Reanod

We Value Your Privacy

In order to improve the website and user experience, this website uses cookies.