Historic Lift: First Turbine Hoisted at World's Highest Wind Farm in Tibet with Sino-Sina Materials

On July 27, 2025, at 11:53 AM, a monumental milestone was achieved in Tibet’s Jonqai County at an altitude of 5228 meters. A 95-meter-long wind turbine blade pierced the sky, perfectly slotting into a hub 110 meters above the ground. This marked the historic first turbine installation of the HuaDian Jonqai 60MW wind farm, the highest-altitude wind power project under construction globally. As Tibet celebrates the 60th anniversary of its autonomous region, this green energy triumph in the "forbidden zone of life" showcases the cutting-edge technology of Sino-Sina Building Materials Co., Ltd., illuminating the power of Chinese innovation.5156e6501e6732a7405f3d4803d3061.jpg

The Ultimate Challenge: A Mission Impossible on the Roof of the World

The Jonqai wind farm, perched at 5370 meters, posed unprecedented challenges:

  • Extreme Altitude: With oxygen levels at just 57% of those at sea level, even breathing is a struggle for workers.

  • Harsh Climate: Temperatures plummet to -30°C, with daily swings of up to 20°C, risking material brittleness and fatigue. Gale-force winds up to 9 levels and intense UV radiation push structural stability to the limit, with operational wind speeds reaching 10 m/s.

  • Logistical Nightmare: Transporting hundred-ton equipment across a 1670-meter vertical ascent through treacherous "sky roads" demanded unparalleled precision and durability.e11c9946fcf29b00f5ac639753b1a7b.jpg

Breaking Barriers with Advanced Materials

Sino-Sina Building Materials Co., Ltd. rose to the challenge with tailor-made high-altitude solutions, fortifying the project with robust materials:

  • Ultra-High Strength Wind Power Grout: Acting as the "anchor" in frozen soil, this grout ensures rock-solid turbine foundations, defying the plateau’s extreme conditions.

  • Superhydrophobic Anti-Icing Self-Cleaning Coating: A "snow shield" for turbine blades, this coating prevents ice buildup, maintaining performance in subzero temperatures.

  • High-Altitude Long-Life Anti-Corrosion Coating System: This protective "armor" extends the lifespan of turbine components, resisting corrosion in harsh environments.

  • Splicing Adhesive: The "steel tailor" for high-altitude assembly, this adhesive ensures seamless, durable connections between components.

    6cc81c4682e4a08ce031d5fca0374c6.jpg

Sino-Sina: Turning the Impossible into Reality

Sino-Sina Building Materials Co., Ltd. transforms challenges into opportunities, using innovative materials to power green energy on the Tibetan Plateau. Our technology-driven solutions not only supported the historic Jonqai 60MW wind farm but also set a new benchmark for extreme-environment engineering. With science as our pen and innovation as our ink, Sino-Sina continues to write the story of Chinese materials, bringing sustainable energy to the world’s most demanding landscapes.

Onshore Wind foundation grout

Onshore Wind foundation grout

Onshore Wind foundation grout

None

None

Start Enhancing Your Business With a Concrete Solution Today

Our products have undergone rigorous testing at our national testing laboratory (CABR testing center co., ltd). Renowned Fortune Global 500 firms such as China Railway Group Limited, China Communications Construction Company Limited, and Sinohydro are among our esteemed clients.


Contact Us

Contact Us

Tel.:

+86 153 7387 2353 Manager Guo

E-mail:

WhatsApp:

Get in Touch

Get in Touch

Copyright © Sino-sina Building Materials Co., Ltd. All Rights Reserved | Sitemap | Powered by