Yangzhou Jiangdu 13MW – Distributed Wind Tower Segment Jointing
Project snapshot
Location: Jiangdu District, Yangzhou, Jiangsu, China
Capacity: 13 MW (2 × 6.25 MW)
Hub height: 140 m
Tower configuration: Concrete tower 126.1 m (38 rings) + Steel section 11.431 m (project brief)
Site type: distributed wind at an industrial plant area
Why this case matters
Industrial-site projects often require controlled construction management, clean execution, and predictable schedules. Segment jointing material needs to be easy to apply and dependable in curing behavior.
Adhesive solution
Two‑component epoxy adhesive was used for hybrid tower precast segment jointing to support stable assembly and joint sealing.
Related Products
Related Cases
Start Enhancing Your Business With a Concrete Solution Today
Our products have undergone rigorous testing at our national testing laboratory (CABR testing center co., ltd). Renowned Fortune Global 500 firms such as China Railway Group Limited, China Communications Construction Company Limited, and Sinohydro are among our esteemed clients.
Navigation
Navigation
Contact Us
Get in Touch
Get in Touch