Hybrid Wind Tower Segment Jointing Projects

Lixin Jiwang 100MW Wind Farm – Hybrid Tower Segment Jointing

Project snapshot

  • Location: Lixin County, Anhui, China

  • Capacity: 100 MW (20 × 5 MW)

  • Hub height: 160 m

  • Rotor diameter: 192 m (project brief)

  • Tower structure: steel‑concrete hybrid; tower built in multi‑segment configuration

Jointing focus
For tall hybrid towers, segment joints must deliver predictable bearing and shear transfer, while also helping control moisture ingress at the joint line.

Material used
Structural epoxy adhesive for wind turbine precast segments was used for jointing / gap filling at segment interfaces to support stable assembly and long‑term durability.


Lixin Jiwang 100MW Wind Farm – Hybrid Tower Segment Jointing

Lixin Jiwang 100MW Wind Farm – Hybrid Tower Segment Jointing

Lixin Jiwang 100MW Wind Farm – Hybrid Tower Segment Jointing

Lixin Jiwang 100MW Wind Farm – Hybrid Tower Segment Jointing

Lixin Jiwang 100MW Wind Farm – Hybrid Tower Segment Jointing

Lixin Jiwang 100MW Wind Farm – Hybrid Tower Segment Jointing

Related Products

CBGM Onshore Wind Power High Strength Non-Shrink Grout

CBGM Onshore Wind Power High Strength Non-Shrink Grout

High-strength non-shrink cementitious grout engineered for onshore wind-turbine foundations—fast strength gain, high flow, micro-expansion, and long-term durability.

Start Enhancing Your Business With a Concrete Solution Today

Our products have undergone rigorous testing at our national testing laboratory (CABR testing center co., ltd). Renowned Fortune Global 500 firms such as China Railway Group Limited, China Communications Construction Company Limited, and Sinohydro are among our esteemed clients.


Contact Us

Contact Us

Tel.:

+86 153 7387 2353 Manager Guo

E-mail:

WhatsApp:

Get in Touch

Get in Touch

CAPTCHA
Copyright © Sino-sina Building Materials Co., Ltd. All Rights Reserved | Sitemap | Powered by Reanod

We Value Your Privacy

In order to improve the website and user experience, this website uses cookies.