Lixin Jiwang 100MW Wind Farm – Hybrid Tower Segment Jointing
Project snapshot
Location: Lixin County, Anhui, China
Capacity: 100 MW (20 × 5 MW)
Hub height: 160 m
Rotor diameter: 192 m (project brief)
Tower structure: steel‑concrete hybrid; tower built in multi‑segment configuration
Jointing focus
For tall hybrid towers, segment joints must deliver predictable bearing and shear transfer, while also helping control moisture ingress at the joint line.
Material used
Structural epoxy adhesive for wind turbine precast segments was used for jointing / gap filling at segment interfaces to support stable assembly and long‑term durability.
Related Products
Related Cases
Start Enhancing Your Business With a Concrete Solution Today
Our products have undergone rigorous testing at our national testing laboratory (CABR testing center co., ltd). Renowned Fortune Global 500 firms such as China Railway Group Limited, China Communications Construction Company Limited, and Sinohydro are among our esteemed clients.
Navigation
Navigation
Contact Us
Get in Touch
Get in Touch