Baofeng County (Henan) 100MW – Hybrid Tower Segment Jointing
Project snapshot
Location: Baofeng County, Pingdingshan, Henan, China
Capacity: 100 MW (20 × 5 MW)
Tower height: 160 m
Hybrid tower configuration: Concrete 137.96 m + Steel 17.84 m
Logistics note: sites distributed across farmland with complex routes (project brief)
Why epoxy jointing was selected
Hybrid tower segment joints require controlled placement, stable cured geometry, and reliable load transfer—even when erection windows are tight and transport is complicated.
Solution
Structural epoxy adhesive was used for precast segment jointing to support rigid bonding and help manage joint sealing performance.
Related Products
Related Cases
Start Enhancing Your Business With a Concrete Solution Today
Our products have undergone rigorous testing at our national testing laboratory (CABR testing center co., ltd). Renowned Fortune Global 500 firms such as China Railway Group Limited, China Communications Construction Company Limited, and Sinohydro are among our esteemed clients.
Navigation
Navigation
Contact Us
Get in Touch
Get in Touch