Bozhou Huaidong Phase II (51MW) – Hybrid Tower Segment Jointing

Project snapshot

  • Location: Qiaocheng District, Bozhou, Anhui, China

  • Capacity: 51 MW

  • Turbines: 3 × 6.0 MW + 6 × 5.5 MW

  • Hub height: 170 m

  • Tower configuration: Concrete 137.96 m + Steel 32.04 m (hybrid)

Jointing requirement
Higher hub heights and larger rotors increase structural demands on segment joints. The jointing material must support reliable load transfer, minimize voids at the joint line, and keep erection moving with predictable working time.

Adhesive solution
A structural epoxy adhesive for precast segments was selected for hybrid tower jointing to provide rigid bonding and sealing at segment interfaces. Thixotropic consistency helps placement control on vertical joint surfaces during assembly.

Typical workflow
Surface preparation → A/B mixing → continuous application → segment stacking and alignment → post‑tensioning per design → cure under site conditions.


Related Products

CBGM Onshore Wind Power High Strength Non-Shrink Grout

CBGM Onshore Wind Power High Strength Non-Shrink Grout

High-strength non-shrink cementitious grout engineered for onshore wind-turbine foundations—fast strength gain, high flow, micro-expansion, and long-term durability.

Start Enhancing Your Business With a Concrete Solution Today

Our products have undergone rigorous testing at our national testing laboratory (CABR testing center co., ltd). Renowned Fortune Global 500 firms such as China Railway Group Limited, China Communications Construction Company Limited, and Sinohydro are among our esteemed clients.


Contact Us

Contact Us

Tel.:

+86 153 7387 2353 Manager Guo

E-mail:

WhatsApp:

Get in Touch

Get in Touch

CAPTCHA
Copyright © Sino-sina Building Materials Co., Ltd. All Rights Reserved | Sitemap | Powered by Reanod

We Value Your Privacy

In order to improve the website and user experience, this website uses cookies.