Anhui Yongqiao 50MW – Hybrid Tower Segment Jointing
Project snapshot
Location: Yongqiao District, Suzhou City, Anhui, China
Capacity: 50 MW (10 × 5 MW)
Tower height: 160 m
Hybrid tower configuration: Concrete 131.78 m + Steel 25.52 m
On-site conditions
With turbine sites located across farmland, logistics and on-site handling can be complex. Jointing materials must be workable and controllable during tower assembly.
Jointing solution
A two‑component epoxy adhesive was used at segment interfaces to support rigid bonding and sealing, improving joint consistency during assembly.
Related Products
Related Cases
Start Enhancing Your Business With a Concrete Solution Today
Our products have undergone rigorous testing at our national testing laboratory (CABR testing center co., ltd). Renowned Fortune Global 500 firms such as China Railway Group Limited, China Communications Construction Company Limited, and Sinohydro are among our esteemed clients.
Navigation
Navigation
Contact Us
Get in Touch
Get in Touch