Ground engineering projects rarely fail because of one problem alone. In most tunnels, shafts, mines and buried structures, water ingress, hidden voids, unstable ground, weak support zones and difficult access conditions often appear together. That is why repair and stabilization work needs more than a single grout or a single repair method.
ZRETE’s Ground Engineering Solutions are built around practical underground jobsite needs. The system covers PU injection grouting for active leaks and void filling, high-water and super-high-water backfill grouts for mine filling, inorganic borehole sealing grouts for gas drainage and safety drilling, and inorganic reinforcement grouts for fractured rock and advance support.
This solution family is suitable for tunnel leak sealing, underground void filling, slab undersealing, mine backfill, goaf filling, borehole sealing, deep-hole pre-grouting, broken rock stabilization and coal slurry treatment. The goal is simple: choose the right material route by water condition, ground condition, target strength, pumping requirement and long-term service demand.
PU Injection Grouting Solutions for leak sealing, void filling and underground stabilization
Mine Backfill, Borehole Sealing & Advance Support Solutions for underground filling, sealing and reinforcement
Active water leakage in tunnels, basements and shafts
Voids behind lining, retaining walls or slabs
Mine goaf filling and fire-prevention filling
Gas drainage borehole sealing and anti-outburst drilling support
Broken rock, fault zones and advance support reinforcement
Coal slurry dewatering, solidification and reuse
Mine Backfill, Borehole Sealing & Advance Support Solutions
From mine backfill to borehole sealing, one solution family for underground control
ZRETE’s underground mining solution combines high-water and super-high-water backfill grouts, coal mine borehole sealing grout, advance support reinforcement grout and coal slurry solidification agent for filling, sealing, reinforcement and slurry treatme
PU Injection Grouting Solutions
W-6 first, with two additional PU routes for different site conditions
W-6 is the lead product in this PU injection solution family. It is designed for projects that need controlled expansion, closed-cell filling, fast return to service and stable support recovery after curing. For projects dominated by active water leakage,
Start Enhancing Your Business With a Concrete Solution Today
Our products have undergone rigorous testing at our national testing laboratory (CABR testing center co., ltd). Renowned Fortune Global 500 firms such as China Railway Group Limited, China Communications Construction Company Limited, and Sinohydro are among our esteemed clients.
Navigation
Navigation
Contact Us
Get in Touch
Get in Touch